Home EV charging in Texas is not a single equipment purchase. A workable installation depends on where the vehicle parks, how much electrical capacity the property has, who controls the parking area, which local authority handles electrical permits, and how electricity is billed at the address.
The most reliable decision order is parking access, electrical assessment, property approval, local permit, charging output, and electricity plan. Buying a charger before resolving those questions can leave a homeowner with an oversized device, a renter without installation approval, or an electricity plan that costs more after the EV is added.
Start With the Parking Space
The parking arrangement often determines the installation method before charger brand, connector type, or maximum amperage becomes relevant. A private attached garage may need only a short dedicated circuit. A detached garage, driveway, carport, apartment structure, or shared parking lot can require trenching, property approval, separate metering, network access, or managed charging.
| Parking Setup | Likely Charging Path | Issue to Resolve First |
|---|---|---|
| Private attached garage | Level 1 or dedicated Level 2 circuit | Panel capacity and cable route |
| Detached garage | Hardwired outdoor-rated Level 2 equipment | Feeder capacity, trenching, and distance |
| Private driveway or carport | Wall-mounted unit or protected pedestal | Weather exposure and cable placement |
| Assigned apartment or condo space | Tenant-metered or networked charging | Written property approval and billing |
| Unassigned shared parking | Shared stations with access controls | Reservations, payment, and parking enforcement |
Attached Garages
An attached garage usually offers the shortest route from the electrical panel to the vehicle. The installer still needs to examine wall construction, attic access, finished rooms above or beside the garage, the position of the vehicle’s charging port, and whether the charging cable can reach without lying across a walking path.
Future parking patterns also matter. A charger placed for a vehicle that backs into the garage may be awkward if a later vehicle has its inlet on the opposite side. A central wall position or a unit with sufficient cable length may reduce the need to relocate the circuit later.
Detached Garages and Carports
A detached structure may be served by an existing feeder or subpanel, but its available capacity must be checked. A panel in the detached garage does not automatically mean it can support another continuous high-load circuit.
Where new wiring must cross a yard, the quote may include trenching, conduit, concrete work, landscape restoration, an upgraded feeder, or a new subpanel. These site costs can exceed the price of the charging unit itself.
Driveways and Open Parking
A charging cable should not be routed across a public sidewalk, common walkway, garage-door opening, or vehicle path as a routine solution. Open parking may require a fixed pedestal, protected wall position, cable holder, and placement that reduces vehicle-impact risk.
The equipment, plug, receptacle, enclosure, and connections must be suitable for the actual environment. Federal home-charging guidance distinguishes 120-volt Level 1 charging from 240-volt Level 2 charging and states that outdoor installations require outdoor-rated equipment.[Charging standard]
Match Charging Power to Daily Use
The charger’s largest advertised amperage is not the correct target for every home. The useful question is how much energy must return to the battery before the vehicle leaves again.
Charging output should be based on daily mileage, vehicle efficiency, time parked at home, the vehicle’s onboard AC charging limit, existing electrical capacity, and any lower-cost charging window offered by the electricity plan.
When Level 1 May Be Enough
Level 1 charging uses a 120-volt connection. It may meet daily needs for a plug-in hybrid, a vehicle driven relatively few miles each day, or a vehicle that remains parked for long periods.
The outlet should not be treated as suitable merely because the charging cord fits. Its condition, branch circuit, grounding, other connected loads, and ability to support repeated charging must be checked. A general-purpose garage outlet shared with a refrigerator, freezer, tools, or door opener may not provide the dedicated arrangement recommended for regular charging.
When Level 2 Is More Practical
Level 2 charging normally uses a 240-volt circuit in a residence. It is more practical for long commutes, larger batteries, irregular schedules, two-driver households, or vehicles that must recover substantial energy during a shorter overnight period.
A 48-amp unit does not necessarily charge a vehicle faster than a lower-output unit. The vehicle’s onboard charger may accept less power, and the vehicle may remain parked long enough for a 24-amp or 32-amp setting to replace the same daily energy. Lower configured output can also reduce the electrical work required at some properties.
Estimate the Energy That Must Be Replaced
A useful estimate begins with the vehicle’s actual driving pattern rather than its full battery capacity.
- Monthly battery energy: monthly miles divided by the vehicle’s efficiency in miles per kilowatt-hour.
- Electricity drawn from the home: battery energy divided by the estimated charging efficiency.
- Energy required per charging night: monthly wall energy divided by the usual number of home-charging sessions.
- Minimum charging rate: energy required per session divided by the number of hours available.
Charging losses vary with the vehicle, equipment, temperature, battery condition, and charging power. The calculation should therefore be treated as a planning estimate rather than an exact prediction of the next electric bill.
Compare Texas Electricity Plans Using the Whole Household Bill
Texas does not have one statewide residential electricity market. Some addresses are in competitive retail areas where the customer may select a retail electric provider. Other addresses are served by a municipally owned utility or electric cooperative that has not entered customer choice.
Municipal utilities and electric cooperatives may choose to participate in customer choice, but participation is not automatic.[Service territory] An Austin Energy customer, a CPS Energy customer, and a household in a competitive retail area therefore face different plan-selection and incentive options even when they own the same vehicle.
Identify the Utility Structure at the Address
In a competitive retail area, the retail electric provider sells the plan and sends the bill. The transmission and distribution utility maintains the local delivery system, meter, poles, and wires. Changing the retail provider does not replace the local distribution utility.
In a non-choice service territory, the household generally evaluates the rates and EV programs offered by its existing municipal utility or cooperative rather than shopping among retail electric providers.
Read the Electricity Facts Label
Plans offered in the competitive market include an Electricity Facts Label, commonly called an EFL. The standardized document contains the plan’s pricing structure, contract information, and other terms.[Plan document]
The advertised average price at 1,000 kilowatt-hours does not show how every household will be billed. An EV can move total consumption across a bill-credit threshold, minimum-use threshold, or pricing tier. The correct comparison uses the home’s expected total consumption after charging is added.
| Plan Item | What to Record | How EV Charging Can Affect It |
|---|---|---|
| Energy charge | Price per kWh and time window | Charging time may change the applicable rate |
| TDU delivery charge | Fixed and per-kWh portions | Per-kWh delivery charges may apply even during promoted hours |
| Base charge | Monthly fixed amount | It remains part of the total bill comparison |
| Bill credit | Usage range required | EV load may earn or eliminate the credit |
| Minimum-use fee | Consumption threshold | Higher use may remove the fee |
| Free or discounted hours | Exact start and end times | The car must be home and scheduled during that period |
| Contract terms | Length and termination fee | Expected savings may not justify switching early |
Test Free Nights Against Daytime Use
A free-nights plan can lower charging costs when most vehicle charging occurs within the promoted window and daytime household consumption remains modest. It can perform poorly when the daytime rate is much higher, the home uses substantial air conditioning during summer afternoons, or delivery charges still apply to nighttime energy.
Households that work from home should examine daytime cooling, cooking, electronics, pool equipment, and water heating. In much of Texas, those loads may cost more than the EV saves during a free or discounted period.
Calculate the Plan With the EV Added
- Estimate the household’s normal monthly consumption from recent bills.
- Add the EV’s estimated wall energy for the same month.
- Separate charging energy into daytime, off-peak, and promoted free-hour buckets.
- Apply the energy price for each period.
- Add variable delivery charges to the energy on which they apply.
- Add monthly base and fixed delivery charges.
- Apply any bill credit, minimum-use charge, or threshold adjustment.
- Compare the resulting total bill, not only the cents-per-kWh charging figure.
Seasonal comparisons are useful. A plan that looks favorable during a mild month may behave differently when summer air-conditioning load raises total consumption.
Permits, Inspections, and Texas Authority
Four Approvals That Are Not Interchangeable
- Texas electrical regulation: state licensing and the electrical code adopted by the Texas Department of Licensing and Regulation.
- Local electrical approval: permits and inspections administered by the authority having jurisdiction for the address.
- Utility approval: service, meter, transformer, or utility-side work when the installation changes demand or electrical service.
- Property approval: authorization from a landlord, condominium association, homeowners association, or other property controller.
Approval from one authority does not replace approval from another. An HOA approval is not an electrical permit, and an electrical permit does not give a tenant permission to alter rental property.
Texas has adopted the 2023 National Electrical Code for the state electrical licensing program, effective September 1, 2023. Local licensing or inspection authorities handle local permit inspections, while TDLR does not perform inspections required by local permitting systems.[Permit authority]
An address inside city limits will commonly fall under the city’s permitting department. An unincorporated address may be handled differently. Some unincorporated areas may not require the same local permit, but the absence of a local permit does not remove the electrical-code obligation.
Who May Perform the Electrical Work
Texas requires non-exempt electrical work to be performed by licensed individuals working through a licensed electrical contractor.[Licence rule]
A state licensing exemption exists for a person performing electrical work on a dwelling that person owns and occupies, but municipal or regional rules may override state licensing exemptions.[Homeowner exemption] A local permit office, rebate program, insurer, equipment warranty, or utility may still require licensed work or inspection. A new EV circuit is not a suitable project for relying on assumptions about the exemption.
TDLR EVSE Registration Is a Separate System
Texas registration rules for commercial charging equipment should not be confused with a residential electrical permit. The TDLR registration requirement does not apply to charging equipment installed in or adjacent to a private residence for noncommercial use. It also exempts equipment provided for the exclusive use of a defined group, including tenants or residents of multiunit housing.[Registration exemption]
That registration exemption does not exempt the branch circuit, receptacle, charger, feeder, service upgrade, or other electrical work from applicable codes, local permits, inspections, or property approvals.
A Practical Permit Sequence
- Confirm whether the property is inside a municipality or in an unincorporated area.
- Identify the local building, development services, or electrical inspection office.
- Ask whether the electrician obtains the permit or the property owner must apply.
- Confirm whether a load calculation, equipment specification, site plan, or panel information is required.
- Determine whether a panel or service upgrade requires utility review before installation.
- Complete the installation under the approved scope.
- Schedule the required inspection before treating the charger as ready for regular use.
- Keep the permit number and final approval with the equipment records.
Complete the Electrical Assessment Before Buying Equipment
A vacant breaker position does not prove that a home has enough electrical capacity for a charger. The electrician must consider the service rating, calculated load, existing appliances, heating and cooling equipment, electric water heating, cooking equipment, pool systems, solar equipment, batteries, and planned future loads.
Panel Space and Load Capacity Are Different
A panel may have physical room for a breaker but insufficient calculated capacity. The opposite is also possible: the service may have capacity, but the panel may require rearrangement, a listed tandem arrangement, a subpanel, or replacement to create a suitable circuit position.
The final quote should identify the proposed charging current, breaker and conductor arrangement, wiring route, panel work, and any load-management equipment. A quote that lists only “charger installation” does not show enough scope for a meaningful comparison.
Consider Load Management Before a Service Upgrade
A full service upgrade is not the only response to limited capacity. Depending on the property and equipment, the electrician may be able to configure a lower charging current, install a listed load-management system, share capacity between two chargers, or prevent the charger from operating while another large load is active.
These options must be evaluated for the specific panel, service, charger, and local code. They should not be added as unreviewed plug-in accessories.
Plan for a Second Vehicle Without Oversizing Everything
A two-EV household does not always need two chargers operating at their maximum output simultaneously. Power-sharing equipment can divide a defined electrical limit between two vehicles. Staggered schedules may also meet both drivers’ needs when the vehicles arrive and leave at different times.
Even when only one charger is installed, conduit size, panel location, cable route, network strength, and parking position can be planned so that adding a second connection later requires less demolition.
Choose Between Hardwired and Plug-In Level 2 Charging
Both configurations can be appropriate when properly selected and installed. The decision affects weather exposure, output, serviceability, receptacle requirements, portability, and the number of electrical connection points.
| Decision Point | Hardwired Equipment | Plug-In Equipment |
|---|---|---|
| Typical use | Permanent installation | Removable charging unit |
| Outdoor placement | Often simpler when equipment is outdoor-rated | Requires a suitable outdoor receptacle arrangement |
| Electrical connections | No plug-and-receptacle connection | Adds a receptacle and plug connection |
| Higher charging output | Common choice where the approved unit and circuit support it | Limited by the plug, receptacle, circuit, and charger configuration |
| Moving the charger | Electrical disconnection is required | Unit can be unplugged when compatible with the new location |
| Rental property | Creates a more permanent alteration | Charger is removable, but the receptacle still requires approval |
Do Not Assume a Dryer Outlet Is Ready for EV Charging
An existing dryer receptacle may have an unsuitable circuit arrangement, worn contacts, old wiring, inadequate grounding, another appliance connected to the circuit, or a location that requires repeated plugging and unplugging. An adapter does not correct those conditions.
Regular charging should not depend on an ordinary extension cord, a cord routed under a garage door, a multi-outlet adapter, or an unlisted switching device. The vehicle manufacturer’s instructions and charging-equipment instructions should be followed together with the approved electrical design.
Apartments, Condos, and Rental Homes
Do Not Assume a Statewide Right to Charge
As of July 2026, a Texas renter should not assume that a landlord must approve a private charger installation. House Bill 3706 proposed a tenant installation process during the 2025 legislative session, but its last official action was referral to a House committee on March 26, 2025. It did not become law.[Bill status]
The lease, parking assignment, property rules, condominium documents, and written owner approval remain central to a rental or multifamily installation.
Assigned Parking and Shared Parking Require Different Designs
An assigned space near the resident’s meter may support an individual circuit. An assigned space far from the dwelling panel may require a long wiring route, a common-area electrical source, or networked billing. Unassigned parking usually favors shared stations rather than a charger dedicated to one resident.
Parking assignment should be documented rather than assumed from customary use. A resident who normally parks in the same space may not have the exclusive lease right needed for a permanent installation.
What a Written Installation Request Should Cover
- Exact parking-space number and whether the space is assigned for exclusive use
- Charging-equipment manufacturer, model, connection type, and maximum configured output
- Proposed electrical source and wiring route
- Electrical contractor and permit responsibility
- Method for measuring and paying for electricity
- Ownership of the charger, circuit, conduit, pedestal, and network account
- Responsibility for maintenance, damage, insurance, and software fees
- Access rights for property management and emergency disconnection
- Removal or transfer terms when the resident moves
- Restoration of walls, pavement, landscaping, or parking equipment
Multifamily Billing Options
Connection to the resident’s meter places charging energy on the resident’s normal utility bill. It is easy to understand but may be expensive when the parking space is far from the dwelling’s electrical equipment.
A dedicated measured circuit records energy separately. The property must establish how readings are collected, how charges are calculated, and whether administrative or network costs are added.
A networked shared station can identify users through an application, account, access card, or vehicle connection. It may support several residents but can introduce software subscriptions, payment-processing fees, communication requirements, and rules for moving a vehicle after charging.
A flat monthly fee is simple to administer but may charge low-mileage drivers more than their actual use and high-mileage drivers less. The lease or charging agreement should state whether the amount may change and what service it covers.
A property owner should also determine whether electricity resale, submetering, utility tariffs, or lease-disclosure rules affect the selected billing method. The charging vendor’s payment system does not by itself establish that the property’s billing arrangement is permitted.
Texas Heat, Storms, and Outdoor Placement
Outdoor equipment should be selected and placed for the actual exposure at the property. Direct afternoon sun, wind-driven rain, hail, blowing dust, salt exposure near the Gulf Coast, standing water, and repeated temperature cycling can affect equipment placement and maintenance.
Heat and Direct Sun
The manufacturer’s operating-temperature range and installation-clearance instructions should be checked before selecting a wall. A shaded position may reduce surface temperature, but the charger should not be enclosed in a way that prevents required ventilation or access.
Charging speed can also be limited by the vehicle or equipment when temperatures are high. A reduction in charging output during extreme heat does not necessarily indicate an electrical fault, but repeated shutdowns or error messages require inspection rather than automatic resetting.
Water and Flood Exposure
Outdoor-rated equipment may be used in rain when correctly installed, but it should not be positioned where the charger, receptacle, connection box, or coiled cable is likely to sit in floodwater or recurring ponding. Mounting height and location should reflect drainage conditions at the specific parking area.
A mapped flood zone, a local drainage problem, and the point where water collects on a driveway are different considerations. Properties with known flooding should have the proposed location reviewed against local floodplain and electrical requirements.
Cables, Impact, and Surge Exposure
The charging handle should have a fixed storage position. The cable should remain clear of tires, lawn equipment, doors, and walking routes. A pedestal near vehicle movement may need physical protection that does not obstruct access to the charging connector.
Whole-home or circuit-level surge protection may be discussed with the electrician where storm exposure is a concern. Surge protection can reduce certain electrical risks, but it does not guarantee that charging equipment or a vehicle will avoid all storm-related damage.
Rebates and Charging Rewards After June 30, 2026
Federal 30C Credit Deadline
The federal Alternative Fuel Vehicle Refueling Property Credit does not apply to charging property placed in service after June 30, 2026. For an earlier residential installation, eligibility depended on more than the purchase date. The equipment had to be placed in service by the deadline, installed at the taxpayer’s main home, and located in an eligible census tract.[Tax credit deadline]
A charger ordered before the deadline but installed or made operational afterward does not meet the placed-in-service deadline described by the IRS.
Austin Energy Home Charger Rebate
As of July 2026, Austin Energy lists a rebate covering 50% of the purchase and installation cost of a qualified Level 2 station. The stated maximum is $1,200 for a Power Partner EV-compatible station or vehicle and $900 for a non-compatible station or vehicle.[Utility rebate]
The applicant must receive electricity from Austin Energy and have purchased or leased a plug-in vehicle. Austin Energy also requires a City of Austin electrical permit and inspection for hardwired stations and receptacles installed for plug-in stations, with the installation performed by a licensed electrician.[Installation requirement]
Equipment should not be purchased solely because a retailer describes it as rebate eligible. The current utility equipment list, vehicle compatibility, application timing, funding status, invoices, permit records, and inspection requirements should be checked before committing to the project.
CPS Energy Charging Rewards
CPS Energy lists EV Smart Rewards and EV Off-Peak Rewards for eligible customers. EV Smart Rewards provides a $30 enrollment bill credit and an additional $10 monthly credit for participation in automated charging schedules. EV Off-Peak Rewards provides a $30 enrollment credit and an additional $5 monthly incentive when the program’s charging conditions are met.[Charging rewards]
CPS Energy identifies Monday through Friday from 4 p.m. to 10 p.m. as the peak period for the pathway available to customers without a currently eligible connected device. Vehicle models, charger brands, participation rules, and incentive amounts can change, so eligibility should be checked with the active account and exact equipment before enrollment.
An older CPS Energy charging-equipment incentive is listed as having ended June 30, 2026.[Program end date] That ended equipment incentive should not be confused with the continuing charging-rewards programs.
Check the Utility Before the Retailer
Utility programs are tied to service territory, account type, approved equipment, installation date, funding, and participation conditions. A rebate available in Austin does not apply to a customer served by CPS Energy, an electric cooperative, a competitive retail provider, or another municipal utility.
The utility program should be checked before selecting the charger because an otherwise suitable device may be excluded from a rebate or managed-charging program. The equipment should still meet the vehicle’s needs when no incentive is available.
Compare Installation Quotes by Scope
The lowest total does not always represent the same installation. Each written quote should identify what is included, excluded, provisional, or dependent on inspection.
- Charger model or owner-supplied equipment
- Configured charging current
- Breaker, conductor, conduit, and receptacle or hardwired connection
- Panel modifications or subpanel work
- Load calculation and load-management equipment
- Distance from panel to charger
- Attic, crawlspace, wall, surface-conduit, or exterior route
- Trenching, boring, concrete cutting, or detached-building work
- Permit application and permit fee
- Final inspection scheduling
- Utility coordination or service-upgrade work
- Drywall, paint, landscaping, or pavement restoration
- Surge protection
- Equipment and labor warranties
- Rebate documentation
Quote Conditions That Need Clarification
- A service upgrade is recommended before a panel and load assessment is documented.
- The quote assumes that no permit is needed without checking the installation address.
- An existing dryer receptacle is approved without inspecting the receptacle, wiring, circuit, and connected appliance.
- The largest charger output is recommended without checking the vehicle’s onboard charging limit or overnight parking time.
- The final configured amperage is not stated.
- Permit, inspection, and utility responsibilities are omitted.
- Outdoor placement is proposed without identifying the equipment’s environmental rating.
- Apartment or condominium work is scheduled before written property approval.
A conditional quote can be reasonable when walls are closed, underground routes are unknown, or utility work has not been priced. The conditions and the method for approving additional charges should be stated before work begins.
Installation, Inspection, and First Charge
- Confirm the approved equipment. Verify the model, connection method, circuit design, output setting, parking position, and cable reach.
- Confirm the permit status. Keep the permit number or written determination that applies to the address.
- Complete the electrical work. The installation should match the approved scope, equipment instructions, and required code.
- Label the circuit. The panel directory and any disconnect or load-management equipment should clearly identify the charging circuit.
- Complete the inspection. Do not treat installation completion and inspection approval as the same event.
- Set the charging limit. The charger’s configured maximum must match the installed electrical system rather than merely the unit’s advertised maximum.
- Connect network features. Complete firmware updates, account setup, access controls, schedules, and utility-program enrollment where applicable.
- Test with the vehicle. Observe the first charging session for secure connections, normal equipment status, expected current, and error messages.
Records to Keep
- Electrical permit and final inspection approval
- Electrician’s invoice and contractor information
- Charger purchase receipt
- Manufacturer, model, serial number, and warranty
- Load calculation or electrical assessment
- Configured maximum charging-current record
- Photographs of the panel, circuit labels, conduit route, and completed installation
- Utility rebate or rewards enrollment confirmation
- Landlord, HOA, or condominium approval
- Rental removal, maintenance, and electricity-payment agreement
These records can be useful for warranty service, property sale disclosures, future panel work, charger replacement, insurance questions, rebate review, or adding a second vehicle.
Checks to Complete Before Ordering a Charger
- Is the parking space private, assigned, shared, or subject to relocation?
- Can the charging cable reach the vehicle without crossing a walking or driving path?
- Is the proposed location indoors, outdoors, flood-prone, or exposed to direct sun?
- Has the vehicle’s maximum AC charging rate been confirmed?
- How much energy must be replaced during a normal night?
- Has the panel and service capacity been assessed?
- Could lower output or managed charging avoid unnecessary electrical work?
- Has the local permit and inspection authority been identified?
- Does the installation require utility review or a service upgrade?
- Has a landlord, HOA, condominium association, or property manager approved the work in writing?
- Will electricity be billed through the resident’s meter, a measured circuit, a networked station, or another written method?
- Does the selected electricity plan reduce the total household bill after the EV load is added?
- Are utility incentives still open for the exact account, charger, vehicle, and installation date?
- Do the written quotes include permits, inspection, circuit scope, restoration, and warranty terms?
- Who owns, maintains, insures, and removes the equipment if the resident moves?
Electrical codes, local permit procedures, electricity-plan terms, equipment lists, and utility incentives may change. Confirm the current requirements with the local permitting authority, electric utility, retail provider, property owner, and applicable program before ordering equipment, authorizing electrical work, submitting an application, or making a nonrefundable payment.
Official EV Charging Sources and Program Records
Official Sources and Verification Notes
- ↩ U.S. Department of Energy: Charging Electric Vehicles at Home — Used in “Start With the Parking Space” and “Match Charging Power to Daily Use” for Level 1 and Level 2 charging distinctions, dedicated-circuit considerations, outdoor-rated equipment, and electrical-capacity review.
- ↩ Public Utility Commission of Texas: Municipally Owned Utilities and Electric Cooperatives — Supports the service-territory distinction in “Compare Texas Electricity Plans Using the Whole Household Bill.” Municipal utilities and cooperatives may choose customer choice, but the rule does not mean every service territory offers it.
- ↩ Power to Choose: Electricity Plan FAQs — Defines the Electricity Facts Label used in “Read the Electricity Facts Label” and confirms that electric companies provide a standardized label for each plan.
- ↩ Texas Department of Licensing and Regulation: Electricians Compliance Guide — Used in “Permits, Inspections, and Texas Authority” for the state-adopted electrical code, local inspection responsibility, and code requirements where no local permit is required.
- ↩ Texas Department of Licensing and Regulation: Electricians Program — Sets out the licensing rule described in “Who May Perform the Electrical Work” for non-exempt electrical work and licensed electrical contractors.
- ↩ Texas Department of Licensing and Regulation: Exemptions to Electrician Licensing — Supplies the owner-occupant exemption discussed in “Who May Perform the Electrical Work” and notes that municipal or regional regulations may override listed state licensing exemptions.
- ↩ Texas Department of Licensing and Regulation: Electric Vehicle Charging Stations at a Glance — Supports the private-residence and exclusive multiunit-housing registration exemptions described in “TDLR EVSE Registration Is a Separate System.” It does not remove local electrical permit or inspection requirements.
- ↩ Texas Legislature Online: 89th Legislature Bill Action Record — Provides the last official action used in “Do Not Assume a Statewide Right to Charge,” showing that HB 3706 was referred to a House committee on March 26, 2025.
- ↩ Texas Legislature Online: Introduced Text of House Bill 3706 — Identifies the tenant EV charging proposal discussed in “Do Not Assume a Statewide Right to Charge.” The introduced text describes a proposed process and should not be read as an enacted Texas Property Code provision.
- ↩ Internal Revenue Service: Alternative Fuel Vehicle Refueling Property Credit for Individuals — Confirms the June 30, 2026 placed-in-service deadline and the main-home and eligible-census-tract conditions stated in “Federal 30C Credit Deadline.”
- Return to: rebate amount, installation requirement — Austin Energy: Home EV Charger Rebate — Provides the rebate percentages and maximums used in “Austin Energy Home Charger Rebate,” along with Austin Energy customer, permit, inspection, listing, and licensed-electrician conditions.
- ↩ CPS Energy: Electric Vehicle Charging Solutions — Provides the enrollment and monthly bill-credit amounts, device eligibility information, and peak-period conditions described in “CPS Energy Charging Rewards.”
- ↩ CPS Energy: Electric Vehicle Incentives — Confirms the June 30, 2026 end date stated for the former home charging-equipment incentive under “CPS Energy Charging Rewards.”